GRM LTT Operational Readiness

CLIENT

Arc Flash Studies

Location

Australia

Date

2019-2020

A Logicamms Project
SCOPE
APA engaged LogiCamms to carry out Arc Flash assessments at a number of sites across the country including MurrayLink, DirectLink, Cooladdi, Wallumbilla Compressor Station 3, Moomba Compressor Station (MCS), Brooklyn Compressor Station and Dandenong LNG Facility (DLNG).
DESCRIPTION

LogiCamms were able to help APA assess and manage their arc flash risk at various sites around Australia. LogiCamms carried out calculations to IEEE 1584 and NFPA 70E standards and presented APA with options for reducing incident energy and improving site safety.

Relevant Projects

Relevant Projects

View all Verbrec projects