Featured Projects

111-Line Piggability

Scope

The 111 Lateral pipeline supplies natural gas from the Waitangirua Delivery Point (DP) to the Tawa A and Tawa B gas DPs in Wellington. The line has known coating defects and is consequently operated at a reduced pressure of 18 barg pressure.

Project Summary

The pipeline was last DCVG surveyed in 2009: 156 coating defects were identified. As per AS 2885.3, the use of intelligent pigging inspection (ILI) is required as the preferred minimum inspection technique. In previous experiences, ILI inspection of the 100 Line has found ~200 corrosion metal loss sites.

Verbrec’s Role

  • Design and install permanent pigging facilities for ILI tools including a pig launcher at Waitangirua DP and a receiver at the Tawa A DP
  • Preparation and planning for the site work
  • First Gas supervision and permitting of the site works

Location

Waitangirua – Wellington

Date

2016-2017

Budget

<150K

Categories

Related Projects

Origin

Origin Ironbark

Rio Tinto

Cape Lambert EPC

Woodside Energy Ltd

Browse LNG Project

First Gas Limited (FGL)

Pukearuhe Pipeline LoC Remedials

Monadelphous KT Pty Ltd

Ichthys Onshore Gas Pipelines

Ok Tedi Mining Limited (OTML)

Ok Tedi Tailings Pipeline Concept / Feasibility

Greymouth Petroleum (GPL)

Randor 1A & 1B Well Test Piping Stress Analysis

First Gas Limited (FGL)

WBH Refurbishment Program

Energy Developments Ltd

West Kimberley Power Project

Ergon Energy

Cheepie Barcaldine Gas Pipeline (CBGP)

Arrow Energy

Node 4 Transport Pipeline (N4TP)

Oil & Gas

North Queensland Gas Pipeline NQP1 & NQP2