WBH Refurbishment Program

Scope

Gas-Fired Water Bath Heaters (G-FWBH) Inspection Programme was initiated to satisfy First Gas’s obligations for statutory inspection every ten years in accordance with the Health and Safety in Employment (Pipelines) Regulations.

Project Summary

Many of the heaters have had no inspections performed since installation and several have significant historical internal corrosion scabbing which prevents the corrosion inhibitor from protecting the heater internals.

Verbrec’s Role

  • Supervision of both site mechanical works and workshop refurbishment for ten WBHs
  • Removal, disassembly, blasting, inspection, procurement, fabrication, modifications, coating, reassembly and reinstallation of the WBHs.

Location

NZ

Date

2017-2018

Categories

Related Projects

Australia Pacific LNG

APLNG Globe Valve Bypass Project

Pacific Islands Energy

Motu Fuel Supply Pipeline

Santos GLNG

Roma East Development Project Feed & Detailed Design

Rio Tinto - Hammersley Iron Pty Ltd

West Angelas Gas Facilities EPC

Arrow Energy

B2 Pigging Facilities Construction Project

United Petroleum

Dalby Gas Pipeline Realignment EPC Project

Arrow Energy

Braemar 2 Gas Pipeline

Alinta Energy

Braemar Gas Pipeline

Arrow Energy

B2-RBP Meter Station & Pipeline EPC Project

Arrow Energy

Integrity Management of (Braemar 2) Unpiggable Pipeline

Arrow Energy

Node 4 Commissioning Project

AGL Energy

Newcastle Gas Storage Facility Pipeline Commissioning