Pukearuhe Pipeline LoC Remedials

Scope

The DN750 Oaonui-Rotowaro Gas pipeline (known as the 400Line) runs along the coastal strip in North Taranaki. The pipeline was subjected to a Loss of Containment (LoC) event in October 2011.

Project Summary

Following this an initial repair replacing a section of DN400 pipe took place and included coating repairs before backfilling the pipeline. The re instatement project retains the asset as a permanently above-ground facility. This involves full excavation of 45 metres of pipeline; installation of one concrete plinth and an inspect-a-lift pipe support; re-coating work; associated drainage; installation of retaining walls and permanent batters of trench.

Verbrec’s Role

  • Installation of retaining wall structures at pipeline ends above/below ground interface
  • Construction of surface contour drains
  • Installation of buried subsoil drains, drains, MH and Sumps
  • Construction of a concrete pipe support structure
  • Excavation of the pipeline to remove existing backfill materials
  • Removal of the existing coating on the excavated section of pipeline and recoating
  • As-built survey of the pipeline location, coating and drainage

Location

New Plymouth, North Taranaki

Date

2016-2017

Categories

Related Projects

Origin

Origin Ironbark

Rio Tinto

Cape Lambert EPC

Woodside Energy Ltd

Browse LNG Project

First Gas Limited (FGL)

111-Line Piggability

Monadelphous KT Pty Ltd

Ichthys Onshore Gas Pipelines

Ok Tedi Mining Limited (OTML)

Ok Tedi Tailings Pipeline Concept / Feasibility

Greymouth Petroleum (GPL)

Randor 1A & 1B Well Test Piping Stress Analysis

First Gas Limited (FGL)

WBH Refurbishment Program

Energy Developments Ltd

West Kimberley Power Project

Ergon Energy

Cheepie Barcaldine Gas Pipeline (CBGP)

Arrow Energy

Node 4 Transport Pipeline (N4TP)

Oil & Gas

North Queensland Gas Pipeline NQP1 & NQP2