As part of the development of the proposed James Price Point LNG Precinct, Verbrec was engaged by Woodside to provide technical support for the onshore pipelines portion of the project including Basis of Design and FEED. The onshore project was abandoned by the joint venture in favour of a floating LNG development.
Verbrec’s Role
- Technical Support
- Basis of Design
- FEED