Randor 1A & 1B Well Test Piping Stress Analysis

Scope

Wellfluids from the wellhead 1A & 1B flow to the Well test separator (temporary piping connection) and then to the Randor Plant.

Project Summary

The HAZOP review included a stress analysis of the temporary piping.

Verbrec’s Role

  • Mechanical Engineering Support & Pipe Stressing
  • HAZOP Participation
  • Project Punch-listing & Inspection Participation

Location

Waitangirua – Wellington, NZ

Date

2018

Categories

Related Projects

Origin

Origin Ironbark

Rio Tinto

Cape Lambert EPC

Woodside Energy Ltd

Browse LNG Project

First Gas Limited (FGL)

111-Line Piggability

First Gas Limited (FGL)

Pukearuhe Pipeline LoC Remedials

Monadelphous KT Pty Ltd

Ichthys Onshore Gas Pipelines

Ok Tedi Mining Limited (OTML)

Ok Tedi Tailings Pipeline Concept / Feasibility

First Gas Limited (FGL)

WBH Refurbishment Program

Energy Developments Ltd

West Kimberley Power Project

Ergon Energy

Cheepie Barcaldine Gas Pipeline (CBGP)

Arrow Energy

Node 4 Transport Pipeline (N4TP)

Oil & Gas

North Queensland Gas Pipeline NQP1 & NQP2