Verbrec delivered the EPC of the 1.9km 10″ pipeline and delivery station at Cape Lambert, in JV with Monadelphous and KT-Pipelines. The pipeline connected to the existing purged, cut and capped Rio Pipeline (PL8).

Project Summary

Mono’s-KT pipelines were responsible for the stations construction for this project. Verbrec was responsible for engineering, procurement, regulatory, technical site support/inspection for the station and commissioning. Verbrec was also appointed operator for PL8 (and the new pipeline) during the commissioning of the interconnected pipeline system.

Verbrec’s Role

  • Engineering
  • Procurement
  • Technical Site Support
  • Commissioning

Location

Cape Lambert, WA

Date

2016

Budget

>$20M

Categories

Related Projects

Origin

Origin Ironbark

Woodside Energy Ltd

Browse LNG Project

First Gas Limited (FGL)

111-Line Piggability

First Gas Limited (FGL)

Pukearuhe Pipeline LoC Remedials

Monadelphous KT Pty Ltd

Ichthys Onshore Gas Pipelines

Ok Tedi Mining Limited (OTML)

Ok Tedi Tailings Pipeline Concept / Feasibility

Greymouth Petroleum (GPL)

Randor 1A & 1B Well Test Piping Stress Analysis

First Gas Limited (FGL)

WBH Refurbishment Program

Energy Developments Ltd

West Kimberley Power Project

Ergon Energy

Cheepie Barcaldine Gas Pipeline (CBGP)

Arrow Energy

Node 4 Transport Pipeline (N4TP)

Oil & Gas

North Queensland Gas Pipeline NQP1 & NQP2