Node 4 Commissioning Project

Scope

Pre-commissioning and Commissioning activities of 27km carbon steel Node 4 Transport Pipeline and Node 4 Gathering System, comprising of 33 well head connections.

Project Summary

  • Preparation of Commissioning procedures;
  • Commissioning risk assessment activities;
  • Preparation and approval of AS2885 Operational Documents;
  • On-site pre-commissioning activities;
  • Nitrogen leak test of Node 4 Transport Pipeline;
  • Introduction of gas into Node 4 Transport Pipeline;
  • Nitrogen purging and introduction of gas into Node 4 Gathering System;
  • Preparation and delivery of operations training package and handover;
  • Project delivered ahead of schedule and below budget estimate.

Location

Bowen Basin, Qld

Categories

Related Projects

Arrow Energy

Lynwood to Jordan Pipeline FEED

Arrow Energy

Pipeline Connection Hot Tap / Tie-in

Origin

Origin Ironbark

Rio Tinto

Cape Lambert EPC

Woodside Energy Ltd

Browse LNG Project

First Gas Limited (FGL)

111-Line Piggability

First Gas Limited (FGL)

Pukearuhe Pipeline LoC Remedials

Monadelphous KT Pty Ltd

Ichthys Onshore Gas Pipelines

Ok Tedi Mining Limited (OTML)

Ok Tedi Tailings Pipeline Concept / Feasibility

Greymouth Petroleum (GPL)

Randor 1A & 1B Well Test Piping Stress Analysis

First Gas Limited (FGL)

WBH Refurbishment Program

Energy Developments Ltd

West Kimberley Power Project