Scope

Design of 11kV supply to UG mine. This included the design of an 11kV Kiosk at the workshop, HV cable routing, and connection to the 11kV overhead line.

Project Summary

Detail electrical design included the following:

  • Pole Design – Connection to 11kV overhead line at the power pole
  • HV cable routing included the following sections:
  • Underground installation
  • Cable ladder installation
  • HV Earthing and Lightning System design for the kiosk substation.
  • Arc Flash calculations

Related Projects

Monadelphous Engineering Associates Pty Ltd

Cape Lambert Liquid Fuel System

Monadelphous Engineering Associates Pty Ltd

Ichthys LNG Project

Pro-Test Well Services

Jet Lift Trial Project

Viva Energy

Pressure Vessel Corrosion FFS Assessment

Wiggins Island Coal Export Terminal Pty Ltd (WICET)

WICET Process Control System

Viva Energy

Structural Integrity Assessment and Remediation Works

Australia Pacific LNG

APLNG Globe Valve Bypass Project

MRL Energy

Wodgina 2 Gas Pipeline

Senex Energy Limited

WSGP Phase 3 Export Pipeline

Sino Iron Pty Ltd

Cape Preston Stockyard Management Systems

KBR

Hope Downs 4 Process Control System

BHP Mitsubishi Alliance (BMA)

Modernisation of BMA Control Systems – Stream 2