The Eos Export Pipeline facilitates gas export from Senex’s West Surat Gas Project (WSGP) to the market via Santos’ Comet Ridge to Wallumbilla Pipeline. The pipeline was developed as part of Phase 3 of the WSGP, whereby Senex’s Eos and Glenora fields were further developed.
The design scope included the facilities downstream of the pipeline for metering, pressure regulation and future connection to Jemena’s Queensland Gas Pipeline. The DN200 pipeline was designed based on a design pressure of 15.8 MPag and consists of API 5L X70 PSL2 line pipe material.