Randor 1A & 1B Well Test Piping Stress Analysis

Scope
Wellfluids from the wellhead 1A & 1B flow to the Well test separator (temporary piping connection) and then to the Randor Plant.
Project Summary

The HAZOP review included a stress analysis of the temporary piping.

Verbrec’s Role

  • Mechanical Engineering Support & Pipe Stressing
  • HAZOP Participation
  • Project Punch-listing & Inspection Participation

Location

Waitangirua – Wellington, NZ

Date

2018