Scope

40 km DN250 water pipeline plus various facilities

Project Summary

Galaxy Resources Australia Limited (Galaxy) is intending to increase production at its Mt Cattlin Spodumene Project to 1.6 mtpa. The increased production rate will require a total water demand of 626,000 kL pa, which is some 342,000 kL pa in excess of that currently available from tailings return, site catchment dams and the existing borefield.

Verbrec was commissioned to investigate the water demand, assess potential water resources and develop a strategy for meeting the supply shortfall. The investigation produced recommendations for mine site dam and pumping upgrades supplemented by a new tank farm and 40 km supply pipeline.

Location

Great Southern, Western Australia

Date

2017

Categories

Related Projects

Beach Energy

Hot Oil Efficiency Study

Manildra Group

Shoalhaven Starches Bomaderry Gas Pipeline

First Gas

Broadlands Biogas Upgrade

Northstar Energy

Energy Evolution Hub (EEH) Pre-Feasibility Study

Jpower

Latrobe Valley Hydrogen Energy Supply Chain Pilot Plant

Hydrogen Refuelling Station – Red Bus Trial

Petawatt Hydrogen Pilot

5MW Solar Connection Power Study

Arrow Energy

Girrahween to Bellevue Pipeline FEED

Arrow Energy

Lynwood to Jordan Pipeline FEED

Arrow Energy

Infield Wells Phase 1B Gathering Construction

Epic Energy South Australia Pty Ltd

Snapper Point EPC Project