Motu Fuel

CLIENT

Pacific Islands Energy

Location

Port Moresby, Papua New Guinea

Date

2018–

An OSD Project
SCOPE
Engineering and procurement of an offshore and onshore fuel supply pipeline
DESCRIPTION

OSD provided engineering, procurement, and construction management (EPCM) services to Pacific Islands Energy for the Motu Fuel Supply Pipeline.

The pipeline is DN300, API 5L Grade B carbon steel material designed in accordance with the requirements of AS/NZS 2885.1:2018 (Pipelines – Gas and liquid petroleum).

The pipeline scope commences at the flange connection to a flexible unloading hose at a PLEM located in Bootless Bay, PNG. It runs on the sea floor for a length of approximately 4 km and then runs as a 7.5 km buried pipeline from the shore, crossing up to the connection to the PEAL receiving manifold at the Jackson International Airport Bulk Liquids Storage Facility.

The scope is being delivered in four separable portions:

  • concept design
  • front-end engineering and design (FEED) and environmental approvals
  • detailed design
  • procurement management.