Featured Projects

Henderson Compressor Station

Scope

Verbrec completed FEED, detailed design and construction assistance (including leading commissioning) for 2 x 800kw electric drive gas compressors running up to 8.6 MPa.

Project Summary

Scope of works included:

  • concept design
  • FEED
  • detailed design
  • construction support
  • commissioning

The compressors are installed on the New Zealand gas transmission network to boost gas pressure north of Auckland. Services provided included:

  • compression optimisation
  • lifecycle cost modelling
  • HAZOP of the compressor package
  • compression package localisation
  • commissioning.

Related Projects

Beach Energy

Hot Oil Efficiency Study

Manildra Group

Shoalhaven Starches Bomaderry Gas Pipeline

First Gas

Broadlands Biogas Upgrade

Northstar Energy

Energy Evolution Hub (EEH) Pre-Feasibility Study

Jpower

Latrobe Valley Hydrogen Energy Supply Chain Pilot Plant

Hydrogen Refuelling Station – Red Bus Trial

Petawatt Hydrogen Pilot

5MW Solar Connection Power Study

Arrow Energy

Girrahween to Bellevue Pipeline FEED

Arrow Energy

Lynwood to Jordan Pipeline FEED

Arrow Energy

Infield Wells Phase 1B Gathering Construction

Epic Energy South Australia Pty Ltd

Snapper Point EPC Project