Scope

Multi-disciplinary engineering services associated with facilitating removal of redundant assets as well as design of new tie-in

Project Summary

Santos engaged Verbrec to assess the piping, electrical and associated civil/structural assets around the existing CS1 Jemena Tie-in. Santos identified obsolete infrastructure and instrumentation that required the necessary sections to be removed and replaced with a simpler system.

We completed detailed design of a simplified piping layout, associated pipe support and footing design. In addition, a comprehensive decommissioning scope of work, which included instrumentation and electrical works, was provided to facilitate the removal of redundant equipment.

Multi-disciplinary engineering services included:

  • piping/mechanical engineering
  • civil/structural engineering
  • instrument and electrical engineering.

Related Projects

Santos

Scotia Interconnect Pipeline

Monadelphous Engineering Associates Pty Ltd

Cape Lambert Liquid Fuel System

Monadelphous Engineering Associates Pty Ltd

Ichthys LNG Project

Pro-Test Well Services

Jet Lift Trial Project

Viva Energy

Pressure Vessel Corrosion FFS Assessment

Wiggins Island Coal Export Terminal Pty Ltd (WICET)

WICET Process Control System

Viva Energy

Structural Integrity Assessment and Remediation Works

Australia Pacific LNG

APLNG Globe Valve Bypass Project

MRL Energy

Wodgina 2 Gas Pipeline

Senex Energy Limited

WSGP Phase 3 Export Pipeline

Sino Iron Pty Ltd

Cape Preston Stockyard Management Systems

KBR

Hope Downs 4 Process Control System