The project was considering processing and transporting 18 million tonnes per year of magnetite concentrate via a slurry pipeline. The slurry pipeline is to transport the concentrate to a future port located between La Paloma and Punta Del Diablo. A return water pipeline from the port to the mine site is also under consideration and is to follow the same route.
Verbrec was appointed by Zamin Resources to prepare a definitive feasibility study of the concentrate and return water pipeline system, including capital and operating costs for both pipelines.
Verbrec’s Role
- Definitive Feasibility Study