Featured Projects

Cape Lambert Liquid Fuel System

Scope

7 km DN100 above-ground diesel pipelines and three pump/delivery stations

Project Summary

As part of the Rio Tinto Iron Ore PSU 330B project, involving the installation of power generation and transmission system equipment across Western Australia’s Pilbara region, the liquid fuel handling facilities at Cape Lambert required upgrading.

The upgrade work involved the design, supply, construction and commissioning of the following:

  • Cape Lambert Fuel Facility (CLFF) pumping station inclusive of transfer pumps, pipework, valves, etc.
  • 6.5 km DN100 aboveground pipeline between CLFF and 10KP locomotive refuelling facility
  • 10KP pumping station and ancillary components to integrate with the existing CLFF
  • 0.4 km DN100 aboveground lateral pipeline from the CLFF and 10KP pipeline to the new Cape Lambert Power Station (CLPS)
  • pumping station at CLPS, inclusive of liquid fuel return pump and filtration
  • all associated civil, structural, mechanical, piping, electrical and instrumentation works.

Verbrec was subcontracted to provide the engineering design, procurement and commissioning of the pipelines and associated facilities.

Related Projects

Santos

Scotia Interconnect Pipeline

Monadelphous Engineering Associates Pty Ltd

Ichthys LNG Project

Pro-Test Well Services

Jet Lift Trial Project

Viva Energy

Pressure Vessel Corrosion FFS Assessment

Wiggins Island Coal Export Terminal Pty Ltd (WICET)

WICET Process Control System

Viva Energy

Structural Integrity Assessment and Remediation Works

Australia Pacific LNG

APLNG Globe Valve Bypass Project

MRL Energy

Wodgina 2 Gas Pipeline

Senex Energy Limited

WSGP Phase 3 Export Pipeline

Sino Iron Pty Ltd

Cape Preston Stockyard Management Systems

KBR

Hope Downs 4 Process Control System

QNP

Integrated Project Management