UG Mine Power Distribution
CLIENT
Resolute Mining
Location
Western Australia
Date
2018
A Logicamms Project
SCOPE
Design of 11kV supply to UG mine. This included the design of an 11kV Kiosk at the workshop, HV cable routing, and connection to the 11kV overhead line.
DESCRIPTION
Detail electrical design included the following:
– Pole Design – Connection to 11kV overhead line at the power pole
– HV cable routing included the following sections:
– Underground installation
– Cable ladder installation
– HV Earthing and Lightning System design for the kiosk substation.
– Arc Flash calculations