MRL is expanding its Wodgina Lithium Project by increasing spodumene production and developing a lithium carbonate refinery. To support this expansion, a new 50MW gas-fired power station is required with an upgraded gas supply. The existing DN100 gas pipeline is being replaced with a new DN250 gas pipeline.
Verbrec was engaged by MRL Energy to undertake the FEED for the new pipeline and the subsequent detailed design and commissioning for the pipeline system.