In 2014, PIE gave approval for works to commence on the Erima Fuel Terminal which would include 9ML of Jet A1 storage, bridger, airport refueller loading, drum filling, hydrant supply pumps and piping, and associated systems. The terminal, originally designed and constructed by others, would later have multiple engineering design and construction defects identified. As a result, neither construction nor commissioning was completed. Verbrec assessed the existing design and provided recommendations on the rectifications needed. Following on from this, Verbrec delivered a revised design and provided procurement support to commence the demolition and re-construction of the tanks, piping and hydrant systems.
Verbrec is currently midway through construction and construction support of the Terminal and Hydrant interconnect.
Verbrec’s Role
- Compliance Assessment
- Detailed Engineering
- Procurement
- Construction Management & Support