This project involved multi-disciplinary engineering and drafting services associated with the development of the 5A/5B well pad concept to issued-for-construction status.
Project Summary

Armour Energy engaged Verbrec to further develop well pad 5A and 5B from a concept design state to issued-for-construction deliverables. This included deliverables for the construction of the flowline and wellhead facility and update/creation of deliverables for AS/NZS 2885 compliance.

Multi-disciplinary engineering services included:

  • process safety engineering, including piping and instrument diagrams, HAZOP and flowline depressurisation calculations
  • pipeline engineering, including AS 2885 calculations, alignment sheets, trenching details, crossing details, hydrostatic test plan and fracture control plan
  • piping/mechanical engineering, including wellhead and facility general arrangement drawings, 3D models and material take offs
  • civil/structural engineering, including structural and footing layouts and details
  • instrument and electrical engineering, including earthing details, cause and effect matrix, hazardous area details and instrument datasheets
  • drafting services, including P&IDs, piping arrangement drawings, alignment sheets, and 3D model.