Howden 510 Compressor Coupling Alignment

Scope

The Verbrec Asset Management team was engaged to investigate the root cause of multiple quadraflex coupling failures (thermoplastic elastomer) and provide an engineering solution to improve asset reliability.

Project Summary

The LogiCamms Asset Management team was engaged to investigate the root cause of multiple quadraflex coupling failures (thermoplastic elastomer) and provide an engineering solution to improve asset reliability. Due to unplanned maintenance events, significant production losses and unplanned downtime was incurred. The scope of works included:

  • Review existing operational data relating to the quadraflex coupling assembly
  • Review specification of the quadraflex coupling
  • Communicate with key maintenance stakeholders to better understand historic failure events
  • Develop a set of acceptable alignment figures and tolerances to ensure all future lube oil pump to auxiliary gearbox shaft alignments are conducted consistently and within the recommended alignment tolerances
  • Develop a step-by-step procedure with the aim of providing technical guidance to maintenance technicians conducting shaft alignment work when replacing the quadraflex coupling assembly
  • Calculate the correct torque setting for the lube oil pump holding down bolts

 

SOLUTION
The overall solution comprised of the following activities:

  • Verified if the existing quadraflex coupling was suitable for the current type of service application and operating environment
  • Conducted torque calculations to determine the horsepower rating
  • Developed and approved an alignment procedure to ensure all maintenance technicians use the same procedure to achieve consistent and accurate results
  • Reduced the current level of coupling misalignment and lube oil system vibration
  • Updated the existing information in the maintenance management system to reflect the correct coupling specification

 

BENEFITS
Benefits as a result of the project activities include:

  • A reduction in lube oil pressure compressor trips as a result of fewer coupling failures
  • A reduction in unplanned maintenance and machine downtime
  • Life extension of the quadraflex coupling from a couple of weeks to 16,000 hours
  • An increase in production volume due to a reduction in offline machinery as a result of unplanned corrective coupling maintenance

 

 

Categories

Related Projects

Oil Search Ltd

KMT Major Maintenance Campaign

BHP MetCoal Holdings Pty Ltd

GRM LTT Operational Readiness

Epic Energy

Strategic Asset Management Plan

Oil Search

RBI and IOW Project

Origin Energy

Critical Spares Assessment

Gas Distribution Company

Gas Cooler Remaining Life Assessment

Arrow Energy

RCM Analysis

Arrow Energy

SAP Data Automation Project

Ballance Agri-Nutrients (Kapuni) Ltd.

High Pressure Vessel Inspection

BHP Billiton Mitsui Coal Pty Ltd

PMO 2000 Task Comparison

Eni Australia

Performance Standard Review

Oil & Gas Production – FPSO

ISO 55000 Audit