Scope

Verbrec conducted an inspection of the gas coolers to determine their remaining operational life expectancy.

Project Summary

The scope of works included carrying out internal and external inspections of the headers and tubes plus structure, and providing a report on the operational life expectancy of the coolers.

An internal videoscope inspection was completed that identified significant internal deposits and the potential for under-deposit corrosion to occur, which would substantially shorten the remaining life of the assets.

Verbrec made a recommendation to remove the deposits via a chemical cleaning, which removed a significant volume of deposits. The result was an increase in remaining life expectancy from 5–8 years to 10–15 years.

Related Projects

Santos

Scotia Interconnect Pipeline

Monadelphous Engineering Associates Pty Ltd

Cape Lambert Liquid Fuel System

Monadelphous Engineering Associates Pty Ltd

Ichthys LNG Project

Pro-Test Well Services

Jet Lift Trial Project

Viva Energy

Pressure Vessel Corrosion FFS Assessment

Wiggins Island Coal Export Terminal Pty Ltd (WICET)

WICET Process Control System

Viva Energy

Structural Integrity Assessment and Remediation Works

Australia Pacific LNG

APLNG Globe Valve Bypass Project

MRL Energy

Wodgina 2 Gas Pipeline

Senex Energy Limited

WSGP Phase 3 Export Pipeline

Sino Iron Pty Ltd

Cape Preston Stockyard Management Systems

KBR

Hope Downs 4 Process Control System