Myall Creek Well Pad Concept Development

Scope

This project involved multi-disciplinary engineering and drafting services associated with the development of the 5A/5B well pad concept to issued-for-construction status.

Project Summary

Armour Energy engaged Verbrec to further develop well pad 5A and 5B from a concept design state to issued-for-construction deliverables. This included deliverables for the construction of the flowline and wellhead facility and update/creation of deliverables for AS/NZS 2885 compliance.

Multi-disciplinary engineering services included:

  • process safety engineering, including piping and instrument diagrams, HAZOP and flowline depressurisation calculations
  • pipeline engineering, including AS 2885 calculations, alignment sheets, trenching details, crossing details, hydrostatic test plan and fracture control plan
  • piping/mechanical engineering, including wellhead and facility general arrangement drawings, 3D models and material take offs
  • civil/structural engineering, including structural and footing layouts and details
  • instrument and electrical engineering, including earthing details, cause and effect matrix, hazardous area details and instrument datasheets
  • drafting services, including P&IDs, piping arrangement drawings, alignment sheets, and 3D model.

Related Projects

Beach Energy

Hot Oil Efficiency Study

Manildra Group

Shoalhaven Starches Bomaderry Gas Pipeline

First Gas

Broadlands Biogas Upgrade

Northstar Energy

Energy Evolution Hub (EEH) Pre-Feasibility Study

Jpower

Latrobe Valley Hydrogen Energy Supply Chain Pilot Plant

Hydrogen Refuelling Station – Red Bus Trial

Petawatt Hydrogen Pilot

5MW Solar Connection Power Study

Arrow Energy

Girrahween to Bellevue Pipeline FEED

Arrow Energy

Lynwood to Jordan Pipeline FEED

Arrow Energy

Infield Wells Phase 1B Gathering Construction

Epic Energy South Australia Pty Ltd

Snapper Point EPC Project