Featured Projects

GRM LTT Operational Readiness

Scope

Verbrec carried out an operational readiness build for BHP’s Goonyella Riverside Mine Long Term Tailings (GRM LTT).

Project Summary

Verbrec was requested by BHP to provide operational readiness services for the GRM LTT Project. The following services were provided as part of the deliverables for the project:

  • maintenance review
  • spares review
  • procedures review/development
  • provision of training
  • engineering review of registers, drawings and documents
  • management of change processes.

Location

Brisbane, Queensland, Australia

Date

March 2020 – November 2020

Categories

Related Projects

Beach Energy

Hot Oil Efficiency Study

Manildra Group

Shoalhaven Starches Bomaderry Gas Pipeline

First Gas

Broadlands Biogas Upgrade

Northstar Energy

Energy Evolution Hub (EEH) Pre-Feasibility Study

Jpower

Latrobe Valley Hydrogen Energy Supply Chain Pilot Plant

Hydrogen Refuelling Station – Red Bus Trial

Petawatt Hydrogen Pilot

5MW Solar Connection Power Study

Arrow Energy

Girrahween to Bellevue Pipeline FEED

Arrow Energy

Lynwood to Jordan Pipeline FEED

Epic Energy South Australia Pty Ltd

Snapper Point EPC Project

Santos

Howden 510 Compressor Coupling Alignment