- Delivered integrated multi-discipline detailed design of the metering station and pipeline interconnect on time and on budget;
- Design and modification of the new and existing station control systems to facilitate new bi-directional flow cases;
- Long lead items identified and procured in the early phase of the project to assist with client requirements for early completion;
- Complete pipeline design to AS2885.1, including Fracture Control, Cathodic Protection with Pipeline foreign crossing detail, and methodology prepared.