Featured Projects

McArthur River Pipeline Project

Scope

Verbrec is responsible for the operations and maintenance of Power and Water Corporation’s  (PWC) McArthur River Mine (MRM) Pipeline and Wickham Point Pipeline (WPP).

Project Summary

Verbrec was originally engaged to assist with the transition of the MRM pipeline licence from the incumbent operator to PWC.  This included the development of the consent to operate documentation and submission for regulatory approval.   Verbrec was subsequently appointed as the pipeline operator with PWC becoming licensee.

PWC also appointed Verbrec the operator of the WPP once construction was finished in 2017.

Verbrec’s Role

  • Appointed as Pipeline Operator
  • Pipeline Surveillance
  • Third Party Works
  • CP Inspections and Rectification
  • Excavations Supervision
  • Facility Inspections
  • Corrective Maintenance
  • Specialist Assistance
  • Regulatory Reporting

Location

Northern Territory

Date

2016 – Current

Categories

Related Projects

Manildra Group

Shoalhaven Starches Bomaderry Gas Pipeline

Norilsk Nickel Pty Ltd

Cawse Lateral Pipeline

Colonial First State

First Gas Operator Venture

Palisade

Tasmanian Gas Pipeline O&M

Energy Developments Ltd

West Kimberley Power Project

Ergon Energy

Cheepie Barcaldine Gas Pipeline (CBGP)

Arrow Energy

Node 4 Transport Pipeline (N4TP)

Oil & Gas

North Queensland Gas Pipeline NQP1 & NQP2

Alinta Energy

Pipeline Flow Increase Feasibility Study

First Gas

Ahuroa Gas Storage Facility Expansion

Oil Search

HA Inspection Campaigns

Alinta Energy

Braemar Gas Pipeline