Invall engaged Verbrec to undertake an Operations Study to evaluate four alternative pipeline routes. Brine from the dewatering facility at the port is to be recycled back to the mine site via a return water pipeline. Preliminary sizing and order of magnitude cost estimates were developed for each option with design throughout at 12.5 and 14 MTPA.
Verbrec’s Role
- Route selection
- Rheology laboratory testing
- Basic engineering
- Capital and operating cost estimates