Featured Projects

Nitric Acid Upgrade

Scope
Queensland Nitrates (QNP) required the replacement of their Nitric Acid Reactor at their facility in Moura, Queensland.
Project Summary

The new reactor plant was required to be constructed adjacent to the existing reactor while the existing plant remained operational, and then tied-in and commissioned during a short plant shutdown.

The project required the design and construction of a new building in a narrow access lane between two existing buildings. Verbrec was engaged to provide design expertise in structural design, high pressure and temperature piping and pressure vessels, and to supplement the process and electrical design performed by QNP.

Verbrec’s Role

  • Detailed Design
  • Construction Support

Location

Moura, QLD

Categories

Related Projects