Unlocking a New Era for Renewables and Low-Carbon Energy in Queensland

Share This:

How we helped lay the foundations for a large-scale hydrogen and ammonia hub

The Energy Evolution Hub was conceived as a benchmark project for Australia’s energy transition, bringing together green and blue ammonia production for domestic use and export markets in south-west Queensland.

Northstar Energy engaged Verbrec to deliver a comprehensive pre-feasibility study to assess the project’s viability across technical, commercial and environmental dimensions. The study was designed to help move the project closer to realisation and support informed decision-making around a large-scale low-carbon energy development.

Multi-Phase

Hydrogen-ammonia hub study

Scalable

3-stage clean energy strategy

Investment-Ready

De-risking early-stage projects

Transforming vision into a deliverable strategy

The Energy Evolution Hub was structured as a three-stage development pathway to support phased delivery and long-term growth.

Phase 1 proposed a three metric tonnes per day green ammonia pilot facility powered by a 10 MW grid connection, with integrated water treatment and modular storage. Phase 2 expanded to a 20 MTPD green ammonia plant powered by two 15 MW solar PV farms, a battery energy storage system and a full-scale reverse osmosis water treatment facility. Phase 3 introduced a blue ammonia and urea production facility supported by gas development, natural gas processing and integrated carbon capture.

Solving the challenges of scale, location and sustainability

Delivering a feasibility study of this depth in a remote location required more than standard engineering assessments.

Verbrec’s multidisciplinary team used proven vendor data, historical benchmarks and advanced engineering tools to build an evidence-based understanding of what would be required to bring the Energy Evolution Hub to life. For green ammonia, the study assessed solar PV trackers and battery storage powering electrolysis-based hydrogen production. For blue ammonia, it evaluated autothermal reforming using natural gas feedstock, with captured CO₂ redirected to urea production to maximise carbon utilisation and reduce emissions. The work also included a Class 5 capital cost estimate prepared in accordance with AACE International standards to support investment decision-making.

Ensuring reliable access to renewable electricity and water
Designing modular hydrogen and ammonia storage and transport systems
Evaluating environmental and community impacts
Identifying infrastructure requirements and assessing commercial dynamics

Enabling strategic decisions for a low-carbon future

Confirming a scalable pathway for clean energy growth and investment confidence

The study confirmed the technical feasibility of the Energy Evolution Hub’s phased approach and validated its alignment with growing international momentum toward renewable fuels and integrated carbon capture. More broadly, it provided Northstar Energy with a rigorous assessment of the project’s technical, infrastructure, commercial and social dimensions, helping the team make informed and confident decisions about the next steps. The project also outlined a scalable pathway for combining green and blue hydrogen solutions in support of Australia’s emissions reduction goals and regional economic opportunity.

Related Case Studies

Obsolete Switchgear Replacement

Supporting Pacific Energy Security through Hydropower

Enabling Operational Readiness for a Large-Scale BESS at Eraring

Delivering Long-Term Energy Storage Solutions at Darling Downs

Doubling Gas Storage Capacity in NZ Through Engineering Precision

Enabling Low-Carbon Energy and Biomethane Injection at Broadlands

Delivering Resilient Energy Infrastructure in the Philippines

Delivering Critical LNG Infrastructure at Port Kembla

Assessing the Viability of CO₂ Pipeline Conversion